Unclassified - Jacksonville, FL
posted 3 days ago
The position involves cutting a trench in concrete for the installation of a washer drain pipe. The trench must be at least 12 inches deep and approximately 25-30 feet long. The job is scheduled for Sunday, 11/17, and requires the contractor to have their own tools and saw to complete the task efficiently.